Wednesday 23 September 2015

common Manual Testing Multiple Choice Questions And Answers

51. A metric used to measure the characteristic of the methods, Techniques and tools employed in developing, implementing and maintaining the software system called as
A. Process metric
B. Product Metric
C. Test metrics
Ans:  A

52. Check Sheet(Checklist. is considered a simple , but powerful statistical tool because it differentiates between two extremes.
A. True
B. False
Ans:  A

53. Application should be stable. Clear Design and Flow of the application is needed for Automation testing.
A. False
B. True
Ans:  B

54. Quality plan describes the quality procedures and standards that will be used in a project.
A. False
B. True
Ans:  B

55. How severely the bug is effecting the application is called as
A. Severity
B. Priority
C. Fix ability
D. Traceability
Ans:  A

56. Project Risk affects The Schedule or Resources.
A. True
B. False
Ans:  A

57. The name of the testing which is done to make sure the existing features are not affected by new changes
A. Recursive testing
B. Whitebox testing
C. Unit testing
D. Regression testing
Ans:  D

58. Management and Measurement, It will come under
A. CMM Level 1
B. CMM Level 3
C. CMM Level 4
D. CMM Level 2
Ans:  C

59. AdHoc testing is a part of
A. Unit Testing
B. Regression Tesing
C. Exploratory Testing
D. Performance Testing
Ans:  C

60. Cost of Production = Right The First time cost(RTF. + Cost of Quality.
A. True
B. False
Ans:  A

More Questions & Answers:-
Page1 Page2 Page3 Page4 Page5 Page6 Page7 Page8 Page9 Page10

No comments:

Post a Comment